{"id":30874,"date":"2024-09-12T11:27:23","date_gmt":"2024-09-12T11:27:23","guid":{"rendered":"https:\/\/dryvitprofi.hu\/2024\/09\/12\/a-milestone-in-the-life-of-dryvit-profi-hungarys-largest-solar-power-plant-to-be-built-by-dryvit-profi\/"},"modified":"2025-07-14T13:55:41","modified_gmt":"2025-07-14T13:55:41","slug":"a-milestone-in-the-life-of-dryvit-profi-hungarys-largest-solar-power-plant-to-be-built-by-dryvit-profi","status":"publish","type":"post","link":"https:\/\/dryvitprofi.hu\/en\/2024\/09\/12\/a-milestone-in-the-life-of-dryvit-profi-hungarys-largest-solar-power-plant-to-be-built-by-dryvit-profi\/","title":{"rendered":"A milestone in the life of Dryvit Profi \u2013 Hungary&#8217;s largest solar power plant to be built by Dryvit Profi"},"content":{"rendered":"\n<p>A significant milestone has been reached! <\/p>\n\n<p>Our professional team is now involved in the construction of Hungary&#8217;s largest industrial solar power plant, including the complete electrical utility infrastructure.<\/p>\n\n<p>Participating in this gigaproject is both a true challenge and an honor, as well as a test for us, allowing us to showcase our professional expertise, many years of experience, and quality work on a national scale.<\/p>\n\n<p>The gigantic solar power plant, being built on 50 hectares in the Debrecen area, will cover an area as large as 71 football fields. With a nominal capacity of 43 megawatts, it could potentially cover the annual energy consumption of up to 20,000 households.<\/p>\n\n<p>The facility, set to be completed by the end of next year, will make a significant contribution to reducing our company&#8217;s ecological footprint, which is a key aspect of our environmentally conscious approach, as well as supporting sustainability.<\/p>\n\n<figure class=\"wp-block-image size-full\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1920\" height=\"1080\" src=\"https:\/\/dryvitprofi.hu\/wp-content\/uploads\/2024\/09\/Napelempark-2.jpg\" alt=\"\" class=\"wp-image-25725\" srcset=\"https:\/\/dryvitprofi.hu\/wp-content\/uploads\/2024\/09\/Napelempark-2.jpg 1920w, https:\/\/dryvitprofi.hu\/wp-content\/uploads\/2024\/09\/Napelempark-2-300x169.jpg 300w, https:\/\/dryvitprofi.hu\/wp-content\/uploads\/2024\/09\/Napelempark-2-1024x576.jpg 1024w, https:\/\/dryvitprofi.hu\/wp-content\/uploads\/2024\/09\/Napelempark-2-768x432.jpg 768w, https:\/\/dryvitprofi.hu\/wp-content\/uploads\/2024\/09\/Napelempark-2-1536x864.jpg 1536w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>A significant milestone has been reached! Our professional team is now involved in the construction of Hungary&#8217;s largest industrial solar power plant, including the complete electrical utility infrastructure. Participating in this gigaproject is both a true challenge and an honor, as well as a test for us, allowing us to showcase our professional expertise, many [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":30308,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[641],"tags":[656,657],"class_list":["post-30874","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-debrecen-en","tag-solar-park"],"acf":[],"_links":{"self":[{"href":"https:\/\/dryvitprofi.hu\/en\/wp-json\/wp\/v2\/posts\/30874","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dryvitprofi.hu\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dryvitprofi.hu\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dryvitprofi.hu\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/dryvitprofi.hu\/en\/wp-json\/wp\/v2\/comments?post=30874"}],"version-history":[{"count":1,"href":"https:\/\/dryvitprofi.hu\/en\/wp-json\/wp\/v2\/posts\/30874\/revisions"}],"predecessor-version":[{"id":30875,"href":"https:\/\/dryvitprofi.hu\/en\/wp-json\/wp\/v2\/posts\/30874\/revisions\/30875"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/dryvitprofi.hu\/en\/wp-json\/wp\/v2\/media\/30308"}],"wp:attachment":[{"href":"https:\/\/dryvitprofi.hu\/en\/wp-json\/wp\/v2\/media?parent=30874"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dryvitprofi.hu\/en\/wp-json\/wp\/v2\/categories?post=30874"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dryvitprofi.hu\/en\/wp-json\/wp\/v2\/tags?post=30874"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}